65% Operational Efficiency Gain Through SAP EAM and Fleet Management Redesign
Asset management, fleet restructuring, and mobile work execution delivered against an SAP-audited best practice standard
Company Overview
A regional municipality delivering essential programs and services across several cities and towns, including water distribution and emergency services fleet management. The organization set out to improve efficiency across public works and fleet operations, beginning with a business case rather than a technology decision.
Before: Inefficient Planning, Scheduling, and Fleet Operations
- Planning and scheduling of maintenance work was inefficient, limiting how effectively crews could be dispatched.
- Fleet management data required cleansing before on-time maintenance could be relied upon.
- Regulatory inspection, calibration, and certification processes needed a structured system rather than ad-hoc handling.
- External contractor hours and invoicing were difficult to verify, creating friction in vendor payment.
- Field crews lacked ready access to manuals, task lists, permits, and checklists at the point of work.
The Solution
The engagement began by analyzing the current state and presenting a business case for changing the existing public works and fleet processes before any build started. Following approval, delivery ran through multiple releases on an agile model: fit-gap work to improve planning and scheduling through mobile asset management, implementation of quality inspection, calibration, and certification for regulatory testing, restructuring of fleet management design alongside data cleansing, and deployment of pool asset management so departments could book fleet vehicles and maintain logs. External contractor invoicing moved to a hybrid confirmation model, mobile work management gave field personnel work order access on their devices using existing SAP credentials for single sign-on, and automated workflows were introduced for work order and invoice approval. Change was managed through interactive workshops and training, and SAP conducted an external audit confirming the implemented processes aligned to best practice.
After: Efficient Dispatch, Regulatory Compliance, and Accurate Vendor Payment
- 75% improvement in efficiency for maintenance teams through integration with geographic information and control systems, giving crews asset location and required data in the field.
- Smooth planning, scheduling, and dispatch of work to the asset manager for execution.
- Safety enforced through permits, checklists, and accessible manuals and task lists at the point of work, alongside regulatory testing and calibration.
- Contractor hours recorded through check-in and check-out, with timesheets dispatched after supervisor approval for accurate and timely invoicing.
- External audit passed, with SAP confirming implemented processes were in line with best practice.
Efficiency Gains
- 65% improvement in operational efficiency through standard and business intelligence reporting built on higher quality data.
- Fleet maintenance moved onto an on-time footing following data cleansing and design restructuring.
- Vendor payment accuracy improved through supervisor-approved timesheet dispatch.
- Work order and invoice approvals automated, reducing delays and manual error.
Related projects
Multi-site warehouse automation across four distribution centres and two plants with zero business disruption at cutover
Engineering and ConstructionA single enterprise data warehouse feeding real-time dashboards and predictive planning across a national contractor
Public Sector (Municipal Government)End-to-end brownfield conversion to S/4HANA on-premise with a purpose-built legacy data migration strategy