What to Ask For in an SAP Readiness Report Before 2027 Budget Sign-Off

What to Ask For in an SAP Readiness Report Before 2027 Budget Sign-Off

A readiness report only earns its fee if it supports a decision. Good SAP Migration Services start with a document that ends in a defensible number and a clear path, yet too many reports land on a CFO's desk as 80-page decks full of heat maps, and nobody can say what to fund, what to cut, or what to delay. If you plan to sign off the 2027 budget with an S/4HANA move inside it, you need that clearer document. This guide gives you a buyer's checklist for scope, scoring, dependencies, effort, cost, and architect review.

2iSolutions US has delivered SAP work since 2005, and the pattern repeats across clients. The strongest reports are short on adjectives and long on named objects, named blockers, and named costs.

What Should an SAP Readiness Report Actually Contain?

A useful SAP readiness report holds five deliverables: a scored inventory of custom objects, a readiness rating with named blockers, effort and cost per object, a dependency map, and a recommended path. If any of the five is missing, the budget request rests on guesses rather than evidence.

Think of these five as your acceptance criteria. You can write them into the statement of work before the analysis starts.

  1. Scored inventory: Every custom program, enhancement, interface, and report gets a row and a score.
  2. Readiness rating: One overall rating, with the specific blockers listed by name.
  3. Effort and cost per object: Hours and dollars tied to individual items, not a lump sum.
  4. Dependency map: A view of what calls what, inside SAP and outside it.
  5. Recommended path: Brownfield, greenfield, or selective, with the reasoning stated.

Reports that skip the per-object detail tend to hide the real risk. A single total cannot show you where the money goes.

Why a decision-first report beats a diagnostic dump

Ask the vendor one question before they start: "What decision will this report let me make?" If the answer is vague, the report will be too. A good assessment ends with a recommendation you can approve, reject, or challenge line by line.

Also ask who will read the report and who will sign it. A document written for the architects alone rarely helps a finance committee. Request a two-page executive summary that stands apart from the technical appendix, so each audience gets what it needs.

How Do You Set the Scope So Nothing Hides Outside It?

Scope should cover every system, client, and custom object that touches the migration, including interfaces to non-SAP tools. Narrow scope produces flattering results and nasty surprises later. Define scope in writing, and make the vendor list what it excluded and why.

Start with the obvious items, then push on the edges. Teams often forget the satellite systems that quietly depend on SAP data.

  • Production, quality, and development systems, including sandbox clients
  • Custom ABAP programs, user exits, and enhancements
  • Interfaces to third-party and legacy tools
  • Custom reports and forms that finance or operations still use
  • Batch jobs and scheduled processes

Then ask what the analysis needs from you. Many buyers assume the vendor must see live production business data. It usually doesn't. A code and configuration analysis can run without customer records, which also keeps your security and compliance teams calm.

Questions to ask about scope

  • Which systems and clients did you include, and which did you leave out?
  • Does the analysis require production business data?
  • How do you treat objects nobody has used in years?

That last question matters more than it sounds. Dead code is larger than anyone expects. Years of projects leave behind programs that no user has run since the last upgrade. A good report separates what you use from what you merely carry, because retiring unused code costs far less than converting it.

Usage data tells you what to retire

Ask whether the vendor pulled usage statistics from the system. Execution counts over twelve months show which programs matter. Without them, the report treats a dormant program and a month-end close job as equals, and your cost estimate inflates.

What Should Scoring and Readiness Ratings Look Like?

Scoring should be transparent, repeatable, and tied to named objects. A readiness rating of "amber" means nothing unless the report names the blockers behind it. Ask to see the scoring criteria, the weights, and a sample of rated objects before you accept the method.

Insist on criteria you can audit. Each object should earn its score from facts: compatibility with the simplified S/4HANA data model, use of obsolete database calls, direct table access, and reliance on retired transactions. If the vendor cannot explain why one program scored red and another green, the method is a black box.

Check that the scoring repeats

Run a simple test. Pick ten objects and ask a second reviewer to score them with the same criteria. If the results diverge, the rating depends on who held the pen. Consistent scoring lets you compare phases and defend the numbers to an auditor.

Demand named blockers, not colours

A blocker is a specific item that stops or delays the move. Examples include a custom pricing routine that writes directly to a standard table, or an interface that depends on a retired function module. Ask for a blocker register with an owner, an effort estimate, and a proposed fix for each entry. A register gives your project manager something to track from day one.

How Do You Read the Dependency Map and Interface Risk?

A dependency map shows which programs, tables, interfaces, and external systems rely on each other. It matters because changing one object can break five others. Ask for a visual map plus a searchable list, covering both SAP-internal calls and connections to outside tools.

Interfaces cause more cutover trouble than most buyers expect. A warehouse scanner, a bank file, a tax engine, and a payroll feed can each depend on a field that S/4HANA changes. The report should flag every one and name the team that owns it on your side.

Ask the vendor these questions about the map:

  1. Does it include non-SAP systems, or does it stop at the SAP boundary?
  2. Does it show data flow direction and frequency?
  3. Can you filter it by business process, such as order to cash?
  4. Does it mark objects that share a common dependency, so you can sequence the work?

Sequencing is where the map pays for itself. If six reports all read from one custom table, you fix the table once and retest six reports together. Without the map, teams fix them separately and pay for the same work three times.

Watch for shared data and master data issues

Business partner conversion, material number length, and finance table changes ripple through custom code. A strong report calls these out as cross-cutting items. It should tell you which custom objects touch them and how many.

How Should Effort and Cost Estimates Be Built?

An estimate you can trust breaks hours and dollars down by object type, complexity band, and rate. It states its assumptions, shows a range rather than a single figure, and separates one-time conversion work from ongoing run costs. Without those parts, the number cannot survive a budget committee. For a sense of how the report itself gets produced, this walkthrough of the SAP Readiness Check report steps shows what data feeds the findings.

Ask for estimates in three bands: simple, medium, and complex. Each band should carry an average hour figure and a count of objects. Multiply, and you can check the maths yourself. Then ask for the assumptions behind each band, because a "simple" object in one vendor's view is a "medium" in another's.

Here is what to look for in the cost section:

  • A low, expected, and high range with the drivers of the spread named
  • A contingency line, stated openly rather than buried in rates
  • Testing effort shown separately from development effort
  • Data migration cleansing time, which teams routinely underestimate
  • Retirement savings, showing what you avoid by not converting unused code

Tie the number to the budget cycle

A 2027 budget needs numbers by quarter, not one total. Ask the vendor to phase cost across preparation, build, test, and cutover so finance can place each slice in the right period. Phased costs also show when you can still stop or change course.

Ask about ongoing run costs

Conversion is not the end of the spend. Post-go-live stabilization, hypercare, and monitoring all carry costs that many reports ignore. Services such as SAP Support Services often fill that gap after cutover, so ask the vendor to price the first ninety days of support alongside the project itself.

Which Path Should the Report Recommend?

The report should recommend one of three routes: brownfield conversion of your existing system, greenfield rebuild, or a selective approach that moves chosen data and processes. It must explain the choice using your own object scores, not a generic preference. A recommendation without evidence is a sales pitch.

Brownfield suits organizations with stable processes and a healthy codebase. Greenfield suits those who want to redesign processes and shed years of customization. Selective fits companies that carry parts of the business at different readiness levels, such as a recent acquisition running on a separate system.

Push the vendor to show the trade-offs in plain terms. Which path costs less in year one? Which carries less business disruption? Which leaves you with less custom code to maintain in 2030? Good reports answer all three.

Match the path to your hosting plan

Your hosting decision shapes the route. Companies weighing a move to a hosted or public environment should ask whether the report covers SAP Cloud Migration Services Enterprise scenarios, including what changes when you run clean core rules and limited custom code. Clean core means keeping the standard system unmodified and placing extensions outside it. If you plan this route, the readiness report should show which custom objects survive.

Ask too about database performance. Moving to SAP HANA changes how reports and batch jobs behave, so a report that ignores SAP HANA Performance Tuning leaves a gap. Slow custom queries are common after conversion, and the report should flag likely offenders before go-live rather than after.

How Do You Review the Report Before Sign-Off?

Before sign-off, put the report through an independent architect review and a finance challenge session. The architect tests the technical claims, while finance tests the cost logic. Together they confirm that the number, the scope, and the path hold up before you commit money.

Use a short review routine:

  1. Have a senior architect, ideally someone outside the author team, review the blocker register.
  2. Sample twenty objects and trace each score back to evidence.
  3. Rebuild the cost total from the band counts and hour averages.
  4. Check that every excluded item appears in the exclusion list with a reason.
  5. Confirm that the recommended path matches the scoring, not the vendor's preferred service.

Also read the vendor's wider offer with care. A readiness report that conveniently recommends the largest possible project deserves a second look. Reputable providers of SAP Migration Services will accept challenge, and they will show the working behind each figure.

Check SAP's own guidance

SAP publishes product and conversion guidance for S/4HANA on its site, and your reviewers should compare the report's assumptions against it. Differences are fine when the vendor can explain them. Unexplained differences are a warning.

Frequently Asked Questions

Q. How long should an SAP readiness assessment take?

A. Most assessments run a few weeks, depending on system count and the volume of custom code. Automated code analysis moves quickly, while workshops with process owners set the real pace. Ask for a timeline with named milestones before you sign.

Q. Does a readiness report need access to our production data?

A. Usually not. Code and configuration analysis works on programs, settings, and usage statistics rather than customer or financial records. 2iSolutions US can scope an analysis that keeps business data out of the review.

Q. What is the difference between a readiness report and a business case?

A. A readiness report describes the technical and process condition of your system and prices the work. A business case weighs that cost against benefits such as lower maintenance and faster reporting. You need both before final approval.

Q. Who should own the report inside our company?

A. Give ownership to a business sponsor, usually in finance or IT leadership, with an architect as technical reviewer. Shared ownership prevents the document from stalling between departments.

Q. When should we start if the budget closes soon?

A. Start as soon as you can, because the analysis must finish before the budget committee meets. Even a focused assessment of your highest-risk modules gives you a usable range for the submission.

Turning the Report Into a Budget You Can Defend

A good readiness report gives you five things: scored objects, named blockers, a dependency map, a phased cost range, and a recommended path with its reasoning. When each piece is present and checkable, the budget request stops being a guess and becomes a plan your committee can question.

Treat the report as a negotiating tool as well. Evidence on dead code, interface risk, and cost drivers lets you trim scope, sequence the work, and hold vendors to their numbers. Teams that arrive at sign-off with that evidence spend less time defending assumptions and more time deciding.