A readiness report is only useful if it supports a decision, and most SAP Migration Services deliverables don't. They arrive as a 90-page deck, full of heat maps and generic advice, and your finance team still can't say whether to fund a brownfield conversion or a greenfield rebuild. This guide gives you a buyer's checklist so the report you pay for answers the budget question. 2iSolutions US has delivered SAP work since 2005, and the pattern is consistent: the best reports are specific, scored and open to challenge.
What should an SAP readiness report actually deliver?
A good SAP readiness report delivers five things: a scored inventory of your custom code and objects, a readiness rating with named blockers, effort and cost per object, a dependency map, and a recommended path. If any of those is missing, you can't turn the report into a funded plan.
Think of the report as a purchase order for your 2027 budget. Each deliverable maps to a line you can defend in front of a CFO.
Here is the minimum you should demand in writing before the work starts:
- A scored inventory of every custom program, enhancement, interface and report.
- An overall readiness rating, with each blocker named and tied to an object.
- Effort and cost estimates per object, not per module.
- A dependency map showing what breaks when something changes.
- A recommended path: brownfield, greenfield or selective.
If a vendor offers "a high-level roadmap" instead, push back. A roadmap without per-object numbers is an opinion.
Why a summary slide is not a deliverable
Executives like one-page summaries. Fine. But the summary must sit on top of evidence you can open and audit. Ask for the underlying data file, not only the slides. Your architects will want to sort it, filter it and test it against what they know about the system.
What a brownfield, greenfield and selective recommendation should contain
A recommendation is not a single word. Brownfield means converting your existing system in place, keeping your history and customizations. Greenfield means building a fresh system and moving only the data and processes you choose. Selective means converting some entities or modules and leaving the rest.
Whichever path the report recommends, it should show its reasoning. Ask for the two or three factors that tipped the decision, such as the share of custom code that is still in use or the number of interfaces that need rebuilding. Then ask what would change the answer. A report that can't describe its own breaking point hasn't tested its logic.
How do you scope the assessment so the numbers hold up?
Scope decides whether the numbers hold up. Define the systems, clients, custom namespaces and interfaces in advance, and agree on what counts as in scope for the 2027 budget. A vague scope produces a vague estimate, and vague estimates become change requests later.
Start with the boundaries. Which production systems are included? Do you want sandbox and development systems analysed too? Are third-party add-ons and partner-built extensions inside the review?
Then settle the questions that teams skip:
- Which business units and legal entities will move first?
- Do any systems stay on older releases for regulatory reasons?
- Are there planned divestitures or acquisitions that change the footprint?
- Which integrations touch systems outside SAP?
Do you need to hand over production data?
Usually not. A solid analysis works from system metadata, code and usage statistics, not from your customer or financial records. That matters for security reviews and for legal teams, who will ask the question early. If a provider insists on production business data for a readiness analysis, ask why.
Tell the assessor which systems you plan to retire. Otherwise they will spend days scoring code you intend to switch off.
Who needs to sign off on scope?
Scope documents often get approved by IT alone. That creates trouble later, because finance and business owners discover the boundaries only when the estimate arrives. Get a named person from finance, supply chain and any other major process area to review the scope in writing. The review takes an hour. A scope dispute in week six takes far longer.
How should the report score readiness and name blockers?
The report should score every object on a consistent scale and name each blocker plainly, such as a deprecated function call, a changed data model or an unsupported add-on. A rating without named blockers tells you how worried to feel but not what to fix.
Scoring needs a legend. Ask what each score means in days of work, not just in colours. A "medium" that hides a three-week rewrite is a trap. For a practical example of weighting objects by business impact rather than technical severity alone, see this business-critical readiness score approach.
Watch for three habits in weak reports. Some average scores across the whole system, which hides the dangerous objects. Others rate modules instead of programs. A few also bury blockers in an appendix.
Where dead code changes the picture
Dead code is larger than anyone expects. Years of projects, patches and abandoned experiments leave programs that nobody runs. Usage statistics show which objects actually execute, and a good report separates them from the rest.
This matters for the budget in a direct way. Every object you retire instead of fixing removes effort from the estimate. If the report scores all custom code as live, the number you present to the CFO will be inflated, and you will lose credibility when the real figure comes in lower.
Ask for three views of the inventory:
- Objects used in the last twelve months, with execution counts.
- Objects not used, with a proposal to retire them.
- Objects used rarely, with a business owner who must confirm they stay.
Why business owners must validate the ratings
Technical scoring finds what breaks. It can't tell you what matters. A report that rates a month-end reconciliation program as low priority because few users run it has missed the point. Only the finance controller knows that it runs once, and that the close fails without it.
Build a validation step into the plan. Give each business owner the list of objects tied to their process and ask for a priority and a confirmation of use. This step usually takes a couple of workshops, and it turns a technical document into a business one.
What should the cost and effort estimates look like?
Estimates should show effort per object, the assumptions behind each figure, and a range instead of a single number. A single figure implies certainty that no readiness analysis can honestly offer. A range with stated assumptions lets finance plan a contingency.
Per-object estimates let you do something a module-level figure can't. You can sort by cost, find the ten most expensive objects and ask whether each one is worth keeping. Often a handful of programs drive a large share of the total, and a standard feature now covers what they did.
Check how the estimate treats testing. Many reports price development and forget the test cycles, which routinely cost as much as the fix itself. Ask for build, unit test, integration test and user acceptance hours shown separately.
Which assumptions to put in writing
Every estimate rests on assumptions, and unstated ones cause the worst budget surprises. Ask the provider to list them. Typical examples include the skill level of the developers, the availability of business testers, the number of test cycles and the quality of existing documentation.
Then test them against your reality. If the estimate assumes testers are available two days a week and your team can spare half a day, the cost is wrong before work begins. Adjust the assumption and the number together.
How to handle the cost of data and interfaces
Code is only part of the bill. Data cleansing, archiving and interface rebuilds often take longer than the code work. A report should size them separately, with the data volumes and the number of external connections behind each figure.
Interfaces deserve special attention. Each one has an owner on the other side, whether a bank, a carrier or a customer portal, and that owner has their own schedule. Ask the report to list every interface with its counterpart, so you can start those conversations early.
How do target platform and security fit into the readiness picture?
A readiness report should look beyond code to the platform you will run on and the way you will secure it. Hosting choices, database tuning needs and extension security all change cost and risk, so they belong in the report and not in a later phase.
If you plan to move to the cloud, the report should say what that involves for your estate. Providers that offer SAP Cloud Migration Services Enterprise packages should be able to show how the readiness findings carry into the move plan. Ask whether the same team that scored your objects will help you act on the score.
Performance deserves a line item too. Systems that run well on a legacy database can behave very differently after a move, and SAP HANA Performance Tuning is often the work nobody budgeted for. Ask the report to flag the heaviest custom queries and reports, because those are the objects most likely to need attention.
What to expect on security and extensions
Many companies plan to build extensions on SAP Business Technology Platform, which is the platform SAP offers for integration, extension and data work around the core system. If that is in your plan, the report should cover access, connectivity and data handling for those extensions. Your security team will want to compare the design against SAP BTP Security Best Practices, so ask the provider to describe how they apply them.
Clean core is the principle behind many of these choices. It means keeping custom code out of the core system and placing extensions outside it, so upgrades stay simple. Ask the report how many objects could move out of the core, and what that does to long-term upgrade effort. You can read how SAP describes the product direction on the SAP S/4HANA product page.
How do you turn the report into a funded plan?
You turn the report into a funded plan by converting each recommendation into a phase with an owner, a cost range and a decision date. If the report can't be sliced into phases, finance can't approve it in pieces, and the whole project stalls waiting for a single large sign-off.
Start by sorting the findings into three groups: must do before any move, must do during the move, and can do after go-live. This sequencing tells you what the 2027 budget has to cover and what can wait for the next cycle.
Then follow these steps:
- Pick the recommended path and record the reasons for it.
- Assign a business owner to each major process area.
- Convert effort ranges into a budget with a stated contingency.
- Schedule a checkpoint after the first phase to compare actuals against the estimate.
- Decide which support model covers the period after cutover.
What to ask about delivery support
A report is a plan, and plans need people. Ask whether the provider can supply the delivery team or only the analysis. Many buyers choose to pair a readiness assessment with SAP Migration Services so that the people who found the blockers also fix them. That avoids a handover in which assumptions get lost.
Ask about staffing too. Strong SAP developers and functional consultants are in demand, so confirm that the names behind the estimate will be available when your project starts. Companies exploring an SAP system integrator USA often find that availability is the deciding factor, not price.
How to keep the estimate honest over time
An estimate is a snapshot. Systems change, projects get added and the business moves. Agree on a refresh point, such as three months before kickoff, to re-run the inventory and compare it to the original. A short refresh costs little and catches drift before it reaches the budget.
Frequently Asked Questions
Q. How long does an SAP readiness assessment usually take?
A. Duration depends on the number of systems and the volume of custom code, but most assessments take several weeks from scoping to final report. Business validation workshops add time, so plan for them early. A provider that promises results in days probably runs only an automated scan.
Q. Can we use the report to choose between brownfield and greenfield?
A. Yes, if it shows per-object effort, the share of code still in use and the interfaces that need rebuilding. Those figures let you compare both paths on cost and risk. Without them, the recommendation is just an opinion.
Q. Who should review the report on our side?
A. Include IT architecture, security, finance and the business owners of each major process. Each group tests a different part of the report. 2iSolutions US recommends a short validation workshop with all of them before the report is finalised.
Q. Do we need a separate report for cloud and extension work?
A. Not necessarily, but the report should cover them. It should address hosting, database performance and extension security as part of the same findings. Separate reports often contradict each other.
Q. What should we do if the estimate seems too high?
A. Sort the per-object list by cost and challenge the top ten. Check how much dead code is scored as live and which assumptions drive the number. Most inflated estimates come from those two sources.
Turning a Readiness Report Into a Budget You Can Defend
The best readiness report is one your CFO can read and your architects can audit. It scores objects, names blockers, shows effort as a range and states its assumptions. When it does, the 2027 budget conversation moves from fear to sequencing.
Before you sign off on any report, check it against the five deliverables, test the scope, validate the ratings with business owners and ask how the findings turn into a phased plan. A report that survives those questions is worth the money.